• About
      • Us
        • Our Story
        • Differentiators
        • Team
        • Clients
        • Awards
      • Approach
        • Services
        • Culture
        • Data-Led
        • Net Zero Carbon Firm
        • BIM
      • Specialisms
        • Engineering Services
        • Net Zero Carbon
        • Tall Buildings
        • MMC
        • Facades
  • Projects
  • News
      • Updates
      • Research
  • Careers
      • Working with Us
      • Opportunities
        • Current
        • Graduates
        • Placements
        • Apprenticeships
      • Training & Development
  • Contact
One Creechurch Place

London / Helical / Sheppard Robson / 404,000 sqft

One Creechurch Place is a 21 storey development constructed within the City of London. Tenant marketability was a key driver for the Client and a high level of finishes and a quality office product was required as a result. We worked with the design team to ensure the Client received best value for money in these areas and drive savings through efficiency of material/ product selection, procurement of the works and early consultation with the market to ensure the best solutions were found from the outset – proactively rather than retrospectively.

Key Project Features

  • The building required party wall awards with neighbouring buildings, in particular in relation to the retained party walls and temporary works required for the deep double level basement excavation
  • The shell and core construction constituted a secant piled wall basement and a steel frame with composite floor slabs above ground floor and an innovative double skin Closed Cavity Façade, reducing operational energy demands

Core Five Added Value

  • Final account agreed within less than 1% of Contract sum
  • Works procured within budget and with substantial transfer of risk apportionment
  • Works procured on the basis of stage 2 design to allow design, procurement and construction activities to overlap efficiently
  • 16 weeks saved on the programme through robust procurement and tender process
  • Employer’s Requirements defined clearly to control and protect quality of key areas
  • 95% of contract sum value fixed during main contract tender
We use the title ‘partner’ to describe a director, consultant or senior employee of Core Five Consulting Limited.
© All rights reserved Core Five 2022. Website designed & developed by evokeu
  • Terms and Conditions
  • Privacy Policy